    For those of us headed up to Mille Lacs area to get ready for opener weekend.

    35 north bound at North Branch will go one lane next week for approx 2-3 weeks, then switch to south bound after completion.***

    *** New signs were going up this weekend. I could not find exact details on the MNDOT website.

    Also, the harbor/ramp at Liberty Beach is ice free if you want to back the boat in and start ‘er up. Dock is in.

    -J.

    Eelpoutguy
    Farmington, Outing
    Posts: 9834
    #2198499

    In elk River is now single lane each way

    gimruis
    Plymouth, MN
    Posts: 14913
    #2198500

    In elk River is now single lane each way

    Ah dang it! When I went through there recently, every single traffic light except that first one by Walmart was out. It was like a 2 lane 55 mph highway once you got past that choke point.

    BigWerm
    SW Metro
    Posts: 10253
    #2198501

    I hate it when our 2 seasons overlap… rotflol

    lindyrig79
    Forest Lake / Lake Mille Lacs
    Posts: 5283
    #2198502

    Thanks for the heads up Jon

    Jon Jordan
    Keymaster
    St. Paul, Mn
    Posts: 5607
    #2204050

    Southbound 35 goes to one lane on May 22. Just north of Harris (County 19) to North Branch.

    -J.

    Jimmy Jones
    Posts: 2147
    #2204054

    They’re planing the road surface. Northbound is smooth now where that stretch was a real drag to drive on for the last few years. Pulling a trailer was miserable.

    The inside lane southbound is done so the work will be on the outside lane.

    Jon Jordan
    Keymaster
    St. Paul, Mn
    Posts: 5607
    #2204069

    Great! That stretch was like running a wash board in my one ton!